Project Address: Plot No.12, Vijay Avenue Extension III, Sithalapakkam, Chennai - 600 073.



Features

  • Automatic Lift
  • 24/7 CCTV Camera Surveillance
  • Individual Car Parking
  • Modular Kitchen
  • As Per Vasthu
  • Heat Resistant Tiles
  • Asian Designer Paints
  • Automatic Elevator
  • Branded Specification
  • Bank Approved for Loan

Under Construction


Under Construction

Address: Plot No.12, Vijay Avenue Extension III, Sithalapakkam, Chennai - 600 073.



STRUCTURE
  • RCC framed structure with columns and beams, Renacon ISI AAC Block walls (exterior walls of 9” thickness and interior walls of 4 ½” thickness) plastered and painted.
FOUNDATION
  • Isolated RCC Footing/Pile Foundation
FLOOR FINISHES
  • 2’ X 4’ Hi-End Vitrified Tile flooring with skirting for the entire flat (Tiles Cost fixed Rs.50/- per sq.ft).
  • Bathroom: Glazed/Ceramic Wall for 7’ height and Anti skid ceramic flooring (Tiles Cost Fixed Rs.40/-
  • Service Area: Glazed /Ceramic for 3’ height and Anti skid ceramic flooring.
  • Kitchen: Glazed / Ceramic Tiles for 2’ height above the Granite platform.
DOORS
  • Main Door: Teak Wood with Godrej/equivalent brand lock, Brass Handle, Magic eye, brass bold, brass hinges and Rubber Door Stopper.
  • Other Doors: Good quality Flush doors with Country Wood Frames with Solid Core Flush Doors, Powder coated handle, hinges, tower bolt, good quality lock and rubber door stopper.
  • Toilets and Service Area Doors: ISI Water Proof Doors/PVC Doors with powder coated handle and tower bolt.
WINDOWS
  • First quality UPVC windows with glass panels and MS Grills with Enamel Paints sliding glass openable.
KITCHEN
  • Granite platform to a maximum of 10’ft with single bowl Stainless Steel Sink.
  • Provision for Washing Machine
ELECTRICALS
  • Three Phase Supply with independent Meters
  • Modular Switches will be provided(Litaskhi Brand)
  • Concealed copper wiring internal conduits with PVC for lights, fan, and power plug points. (No fittings will be provided)
  • Polycap/Equivalent Wires ISI
  • Power outlets for Air conditioners in all bedrooms
  • Power outlets for geysers in all bathrooms.
  • Power plug for Grinder/Mixer in Kitchen
  • Power Plug for Refrigerator, TV in hall/dinning
  • Telephone Point in Hall
  • Chimney Point in Kitchen
  • Inverter Point in Hall
BATHROOMS
  • EWC with flush tank in attached bath room (Parry ware)( Ivory Colour)
  • IWC with flush tank in common bath room (Parryware)
  • Two Wash Basins (one in attached bath room and other in Hall)
  • CP Fittings (Metro/Parryware)
  • Two in one water mixed with shower
  • Provision for geysers in all bathrooms
WARDROBES
  • 4' length without shutters in Bedrooms
  • 4’ length without shutters in Kitchen.
LOFTS
  • In shorter span in Bedrooms
  • Two Sides in kitchen
PAINTING
  • Two Coats of Emulsion over one coat of primer with Putty finish for inner walls
  • Asian Royal Design Paints in Hall
  • 3 coats of white in Ceiling
  • Main Door: polish and Varnish Finish on both sides)
  • Other Doors- Enamel paint finish
  • Exterior emulsion finish with over one coat of primer for Exterior walls
WATER SUPPLY
  • All Concealed Pipes are by CPVC material(Finolex/Varun)
  • Other Pipes PVC Material (Individual Plumbing Line)(Finolex)
  • Tapes in appropriate places for water from Common Bore Well
  • Sump and overhead tank of sufficient capacity
  • Single Phase Pump – Sump and Borewell with Covered Grill
COMMON AREAS
  • Automatic Elevator upto Terrace
  • CCTV Camera
  • Covered Car Parking
  • Marble/Granite flooring in the Staircase
  • First Quality Weathering Course facility (Lime Brick/Jelly/coba)
  • Landscaping
  • Anti-termite Treatment
  • Compound wall with Gate
  • Light Fittings in Gate, Parking Area, Staircase and Terrace
  • Rain Water Harvesting
  • Cloth hanging rod in Terrance (independent) and Ring
  • Parking Tiles in Parking Area
  • EB Meter Board (Covered)
  • Name Board

PAYMENT SCHEDULE

  • Advance: Rs.2,00,000/-
  • On or before Registration: 30%
  • Excavation: 15%
  • Plinth Level: 15%
  • On Starting Ground Floor Roof Level: 10%
  • On Starting First Floor Roof Level: 10%
  • On Starting Second Floor Roof Level: 10%
  • Brick Work & Plasteing: 5%
  • Final Payment: 5%