Project Address: Plot No.28 & 29, 3rd Street, Kuberan Nagar, Madipakkam, Chennai 600 091.
16 Lifestyle Apartments @ Affordable Price
2 BHK 800,840,900 and 940 sq.ft
3 BHK 900,940,1050 and 1180 sq.ft
Built on 3 Blocks
16 Flats
Starting from 800 sq.ft to 1180 Sq.ft
Just 3 Kms from Velachery MRTS
Just 1 Kms from Madipakkam Bus Stop
Near School, Colleges, Malls, Markets,Temples etc.,
3 BHK 900,940,1050 and 1180 sq.ft
Built on 3 Blocks
16 Flats
Starting from 800 sq.ft to 1180 Sq.ft
Just 3 Kms from Velachery MRTS
Just 1 Kms from Madipakkam Bus Stop
Near School, Colleges, Malls, Markets,Temples etc.,
Amenities
- Lift
- Covered Car Parking
- Marble/Granite flooring in the Staircase
- Palar Water Connection
- Septic Tank with sufficient capacity
- Rain Water Harvesting
- First Quality Weathering Course facility (Lime Brick/Jelly/coba)
- Landscaping, Anti-termite Treatment
- Compound wall with Gate
- Light Fittings in Gate, Parking Area, Staircase and Terrace
- Parking Tiles in Parking Area
- EB Meter Board (Covered) , Letter Box
Plot no.28 & 29, 3rd Street, Kuberan Nagar, Madipakkam, Chennai 600 091.
STRUCTURE
- RCC framed structure with columns and beams, brick paneled walls (exterior walls of 9” thickness and interior walls of 4 ½” thickness) plastered and painted.
FOUNDATION
- Isolated RCC Footing/Pile Foundation
FLOOR FINISHES
- 2’ X 2’ Vitrified Tile flooring with skirting for the entire flat (Tiles Cost fixed Rs.42/- per sq.ft)(Johnson/equivalent)
- Bathroom: Glazed/Ceramic Wall for 7’ height and Anti skid ceramic flooring (Tiles Cost Fixed Rs.30/-)
- Service Area: Glazed /Ceramic for 3’ height and Anti skid ceramic flooring
- Kitchen: Glazed / Ceramic Tiles for 2’ height above the Granite platform
DOORS
- Main Door: Teak Wood with Godrej/equivalent brand lock, Brass Handle, Magic eye, brass bold, brass hinges and Rubber Door Stopper.
- Other Doors: Good quality Flush doors with Country Wood Frames with Solid Core Flush Doors, Powder coated handle, hinges, tower bolt, good quality lock and rubber door stopper.
- Toilets and Service Area Doors: ISI Water Proof Doors/PVC Doors with powder coated handle and tower bolt.
WINDOWS
- First quality powder quoted aluminum windows with glass panels and MS Grills with Enamel Paints sliding glass openable
KITCHEN
- Granite platform to a maximum of 10’ft with single bowl Stainless Steel Sink
- Provision for Washing Machine
ELECTRICALS
- Three Phase Supply with independent meters
- Modular Switches will be provided(Roma)
- Concealed copper wiring internal conduits with PVC for lights, fan, and power plug points. (No fittings will be provided)
- Polycap/Equivalent Wires ISI
- Power outlets for Air conditioners in all bedrooms
- Power outlets for geysers in all bathrooms.
- Power plug for Grinder/Mixer in Kitchen
- Power Plug for Refrigerator, TV in hall/dinning
- Telephone Point in Hall
- Chimney Point in Kitchen
- Inverter Point in Hall
BATHROOMS
- EWC with flush tank in attached bath room (Parry ware)( Ivory Colour)
- IWC with flush tank in common bath room (Parryware)
- Two Wash Basins (one in attached bath room and other in Hall)
- CP Fittings (Metro/equivalent)
- Two in one water mixed with shower
- Provision for geysers in all bathrooms
WARDROBES
- 4’ length without shutters in Bedrooms
- 4’ length without shutters in Kitchen
LOFTS
- In shorter span in Bedrooms
- Two Sides in kitchen
PAINTING
- Two Coats of Emulsion over one coat of primer with Putty finish for inner walls
- Asian Royal Design Paints in Hall
- 3 coats of white in Ceiling
- Main Door: polish and Varnish Finish on both sides)
- Other Doors- Enamel paint finish
- Exterior emulsion finish with over one coat of primer for Exterior walls
WATER SUPPLY
- All Concealed Pipes are by CPVC material
- Other Pipes PVC Material (Individual Plumbing Line)
- Tapes in appropriate places for water from Common Bore Well
- Sump and overhead tank of sufficient capacity
- Single Phase Pump – Sump and Borewell with Covered Grill
COMMON AREAS
- Lift
- Covered Car Parking
- Marble/Granite flooring in the Staircase
- Palar Water Connection
- Septic Tank with sufficient capacity
- Rain Water Harvesting
- First Quality Weathering Course facility (Lime Brick/Jelly/coba)
- Landscaping, Anti-termite Treatment
- Compound wall with Gate
- Light Fittings in Gate, Parking Area, Staircase and Terrace
- Parking Tiles in Parking Area
- EB Meter Board (Covered) , Letter Box
PAYMENT SCHEDULE
PAYMENT SCHEDULE | |
At the time of Booking Rs.1,00,000/- | |
30% | On or before Registration |
15% | Excavation |
15% | Plinth Level |
10% | On Starting Ground Floor Roof Level |
10% | On Starting First Floor Roof Level |
10% | On Starting Second Floor Roof Level |
5% | Brick Work & Plastering |
5% | Final Payment |
Registration | Actuals |
TNEB & CMWSSB | Actuals |
Service Tax | Actuals |