Puzhithivakkam, Chennai 600 091.


Under Construction


Under Construction


STRUCTURE

  • RCC framed structure with columns and beams, brick paneled walls (exterior walls of 9” thickness and interior walls of 4 ½” thickness) plastered and painted.

FOUNDATION

  • Isolated RCC Footing/Pile Foundation

FLOOR FINISHES

  • 2’ X 2’ Vitrified Tile flooring with skirting for the entire flat (Tiles Cost fixed Rs.42/- per sq.ft)(Johnson/equivalent)
  • Bathroom: Glazed/Ceramic Wall for 7’ height and Anti skid ceramic flooring (Tiles Cost Fixed Rs.30/-)
  • Service Area: Glazed /Ceramic for 3’ height and Anti skid ceramic flooring
  • Kitchen: Glazed / Ceramic Tiles for 2’ height above the Granite platform

DOORS

  • Main Door: Teak Wood with Godrej/equivalent brand lock, Brass Handle, Magic eye, brass bold, brass hinges and Rubber Door Stopper.
  • Other Doors: Good quality Flush doors with Country Wood Frames with Solid Core Flush Doors, Powder coated handle, hinges, tower bolt, good quality lock and rubber door stopper.
  • Toilets and Service Area Doors: ISI Water Proof Doors/PVC Doors with powder coated handle and tower bolt.

WINDOWS

  • First quality powder quoted aluminum windows with glass panels and MS Grills with Enamel Paints sliding glass openable

KITCHEN

  • Granite platform to a maximum of 10’ft with single bowl Stainless Steel Sink
  • Provision for Washing Machine

ELECTRICALS

  • Three Phase Supply with independent meters
  • Modular Switches will be provided(Roma)
  • Concealed copper wiring internal conduits with PVC for lights, fan, and power plug points. (No fittings will be provided)
  • Polycap/Equivalent Wires ISI
  • Power outlets for Air conditioners in all bedrooms
  • Power outlets for geysers in all bathrooms.
  • Power plug for Grinder/Mixer in Kitchen
  • Power Plug for Refrigerator, TV in hall/dinning
  • Telephone Point in Hall
  • Chimney Point in Kitchen
  • Inverter Point in Hall

BATHROOMS

  • EWC with flush tank in attached bath room (Parry ware)( Ivory Colour)
  • IWC with flush tank in common bath room (Parryware)
  • Two Wash Basins (one in attached bath room and other in Hall)
  • CP Fittings (Metro/equivalent)
  • Two in one water mixed with shower
  • Provision for geysers in all bathrooms

WARDROBES

  • 4’ length without shutters in Bedrooms
  • 4’ length without shutters in Kitchen

LOFTS

  • In shorter span in Bedrooms
  • Two Sides in kitchen

PAINTING

  • Two Coats of Emulsion over one coat of primer with Putty finish for inner walls
  • Asian Royal Design Paints in Hall
  • 3 coats of white in Ceiling
  • Main Door: polish and Varnish Finish on both sides)
  • Other Doors- Enamel paint finish
  • Exterior emulsion finish with over one coat of primer for Exterior walls

WATER SUPPLY

  • All Concealed Pipes are by CPVC material
  • Other Pipes PVC Material (Individual Plumbing Line)
  • Tapes in appropriate places for water from Common Bore Well
  • Sump and overhead tank of sufficient capacity
  • Single Phase Pump – Sump and Borewell with Covered Grill

COMMON AREAS

  • Lift
  • Covered Car Parking
  • Marble/Granite flooring in the Staircase
  • Palar Water Connection
  • Septic Tank with sufficient capacity
  • Rain Water Harvesting
  • First Quality Weathering Course facility (Lime Brick/Jelly/coba)
  • Landscaping, Anti-termite Treatment
  • Compound wall with Gate
  • Light Fittings in Gate, Parking Area, Staircase and Terrace
  • Parking Tiles in Parking Area
  • EB Meter Board (Covered) , Letter Box

PAYMENT SCHEDULE

PAYMENT SCHEDULE
At the time of Booking Rs.1,00,000/-
30%On or before Registration
15%Excavation
15%Plinth Level
10%On Starting Ground Floor Roof Level
10%On Starting First Floor Roof Level
10%On Starting Second Floor Roof Level
5%Brick Work & Plastering
5%Final Payment

RegistrationActuals
TNEB & CMWSSBActuals
Service TaxActuals